What to Verify Before You Pay a China Bag Factory

Verify four things before you send money to a China waterproof bag factory: a named site you may audit, structural joining done in-house, a current ISO 9001:2015 and BSCI file, and an AQL 2.5 inspection report written against your own cartons. Everything else on a supplier website is marketing. The four can be produced as documents within a day, and each one can be faked in a way that is easy to detect once you know what the genuine article contains. This page shows the exact wording, the numbers to look for and the sequence in which to ask, so that a 500-piece first order is scheduled on a line that genuinely exists rather than on a photograph of one.

What a China Waterproof Bag Plant Actually Does In-House

The phrase bag factory in China covers a wide range of operations, and most of the confusion a buyer feels comes from assuming the word describes the whole process. In this category at least five distinct steps sit between a roll of greige fabric and a carton on a pallet: lamination or coating, panel cutting, printing or decoration, structural joining, and final assembly with hardware. Only three of those five are normally found under one roof. Lamination is almost always bought from a film or coating specialist in roll form, and hardware such as buckles, cam locks, sliders and coil zips comes from component makers who do not produce bags at all. The useful question to put to a supplier is therefore not whether they are a factory, but which of the five steps they perform themselves.

That question bears directly on the hydrostatic head figure on your spec sheet. A 10,000 mm or 20,000 mm reading is a property of the coated or laminated roll, measured on flat goods before a single seam exists. The welding or sewing line can preserve that value or destroy it, but it cannot create it. A site that buys laminated rolls with lot-level certificates and keeps its own spray and hydrostatic rigs can trace a leak back to a roll number within a working day. A site that only assembles cannot. When you evaluate a China waterproof bag plant, ask for the fabric lot record and the in-house test log at the same time; a supplier who shows you one without the other has told you where the real work happens.

The validated production partner facility standing behind QUANZHOU JUNYUAN BAGS was established in 2014 and has been recorded by SGS at 4,950 square metres, seven production lines, 149 machines and 137 people, with a monthly output of 200,000 pieces. Those figures matter for one specific reason: they are large enough to keep cutting, welding, taping, assembly and packing inside the same building, and proportioned so that a 500-piece first run per model and per colour still gets scheduled on a line instead of being squeezed around somebody else's order. Our manufacturing process page shows the same capacity described step by step rather than as a total.

The 4,950 sqm Floor Plan and Its Seven Sewing Lines

A floor plan tells you more about a waterproof bag plant than a showroom ever will, because a welding line and a garment line look very different from the doorway. Seven lines across 4,950 square metres means each line occupies a defined cell with its own power, extraction and bench height, and that bulky items such as 60-litre duffels and dry bags are not fighting for space against small items such as phone pouches. The table below gives the pattern we use when we allocate a programme to a line. It is the single most useful document to request during a desk audit, because a supplier who actually runs seven lines can fill it in with real shift numbers, and one who brokers orders cannot.

LineMonthly Output (pcs)Primary Product TypeOperators per ShiftJoining Method
Line 146,000Roll-top dry bags 5-20 L18RF welding
Line 236,000Waterproof backpacks 20-35 L21Hot-air weld + stitch-tape
Line 332,000Duffels and holdalls 40-60 L16Hot-wedge weld
Line 428,000Cooler and insulated bags15Stitch + seam tape
Line 522,000Phone pouches and small cases12RF welding
Line 620,000Tool and jobsite bags14Stitch + seam tape
Line 716,000Prototypes, reworks, pilot runs11Mixed, all four methods

Read the last column first. A plant that only stitches and tapes cannot build a genuinely welded dry bag; a plant that only welds will struggle with a structured backpack that needs bound internal seams. RF welding gives a clean, repeatable seam on TPU and PU films but needs a flat, two-dimensional lay-up, which is why it dominates the small-item and roll-top categories. Hot-air and hot-wedge welding accept curves and thicker stacks. Stitch-and-tape is the answer whenever the geometry is three-dimensional or the fabric is too stiff to fold. A real seven-line site will run three or four of these methods simultaneously, which is one reason the 149 machines are distributed as they are rather than concentrated in one room.

Documents to Demand Before You Wire a Deposit to China

Thirty percent of the order value is the standard deposit under T/T 30/70 terms, and it is paid before a single carton exists. That makes the document pack the only leverage a buyer has. Demand the following in writing before the deposit leaves your account, and treat a refusal on any single line as a decision point rather than a negotiating position. A genuine site produces these without discussion because it already holds them for its BSCI and ISO 9001:2015 obligations; an intermediary has to ask somebody else, and the delay is your signal.

Document RequestedWho Issues ItWhat a Genuine Copy ShowsRefusal or Substitute Signal
ISO 9001:2015 certificateAccredited certification bodyCertificate number, site address, scope wording, expiry dateScan without address, or scope that omits bags
BSCI audit reportThird-party social auditFactory name, audit date, worker count, open findingsOld report with a different company name
SGS or equivalent capacity recordInspection companyFloor area, line count, machine count, headcountNumbers typed into a Word file
Business licenceLocal authorityUnified social credit code, registered addressOnly a trading licence with no manufacturing scope
Fabric lot certificatesRoll supplierRoll number, coating weight, hydrostatic head resultNo lot numbers, only a generic mill name
Seam test logThe plant's own labDate, sample ID, peel value, result pass or failNo log exists; testing is described as external
AQL 2.5 inspection reportInspector, per shipmentSampling size, defect classification, accept or rejectReport template with no order reference
UV or print proof recordPrinting sectionMesh count, cure temperature, abrasion passesProof photos with no parameters

Two of these eight are worth more than the other six. The seam test log tells you whether anybody in the building measures a weld before it ships, and the fabric lot certificate tells you whether the roll that produced your approved sample can be bought again for the production run. Everything else confirms existence; those two confirm repeatability. If you can only push for two documents before the deposit, push for those. Our quality control page lists the same set in the order we supply them.

Welding, Taping and Stitching: Which the Plant Runs for You

Four joining methods carry almost every waterproof bag programme, and each one has a cost, a geometry limit and a characteristic failure mode. RF welding melts the film by dielectric heating between two electrodes and produces a seam that is as strong as the film itself when the parameters are right. Hot-air welding blows heated air into the overlap and is gentler on thicker stacks. Hot-wedge welding drags a heated element between the layers and suits long straight runs such as a dry bag body seam. Stitch-and-tape sews the panel first and then lays a waterproof tape over the needle holes under heat and pressure, which is the only method that copes with a three-dimensional corner on a structured pack.

The failure modes are distinct and worth naming on your spec sheet. An RF weld that was run too cool looks perfect and peels apart under finger pressure; it is the classic under-weld, and it is invisible until it is loaded. A hot-air seam run too hot thins the film at the edge of the overlap and tears there first. A taped seam fails at the tape edge where the adhesive was not pressed home, and it usually fails at the very point where two tapes cross, because that is where the press cannot reach both layers equally. When we qualify a new model we deliberately make bad samples at each extreme, peel them, and keep the peel values on file so that a production sample can be compared against a known-good and a known-bad reference.

For a buying decision the practical summary is this. If your product is a roll-top dry bag, a phone pouch, a document case or a wash bag, insist on welded construction and ask what the electrode profile is. If your product is a backpack, a tool bag or anything with a boxed corner, expect stitch-and-tape and ask for the tape width and the seam allowance, since those two numbers together determine whether the tape actually covers the needle line. Tape that is narrower than the stitch line plus three millimetres on each side will leak regardless of how good the adhesive is.

A Two-Day Verification Walk Through the Bag Plant

A site visit is worth the air fare if you follow a route rather than a host. The following sequence takes two working days and is designed so that each step verifies the previous one. It assumes you have already received the document pack above; if you have not, spend the first morning in the office with the files instead.

  1. Arrive unannounced at the gate and ask for the duty manager by name, not for the sales contact who has been emailing you.
  2. Walk the cutting room first and count the cutting tables, then check whether offcut bins are sorted by fabric lot or dumped together.
  3. Stand at the welding cells for twenty minutes and watch three consecutive cycles, noting electrode down-time and whether parameters are displayed or hidden behind a cover.
  4. Open the lab door yourself. Check for a hydrostatic head rig to ISO 811, a spray rig to AATCC 22 and a rain rig to AATCC 35, and ask for the last seven days of log entries.
  5. Ask a machine operator, not the manager, how many pieces of the current model they made yesterday, then multiply by the operator count and compare with the quoted monthly output.
  6. Inspect the finished-goods store for cartons marked with your target market's labelling, and open one to check the packing method matches the carton spec you were quoted.
  7. On day two, review the corrective-action file: three months of complaints with the root cause and the fix recorded for each.
  8. Finish in the sample room and ask to see the previous four rejected prototypes for the model you are quoting, with their rejection reasons.

Steps four and seven are the ones that separate a real plant from a presented one. Any building can look busy on a Monday morning; far fewer can produce seven consecutive days of hydrostatic head and spray results with sample identifiers that match the fabric roll numbers in the store. The corrective-action file is equally diagnostic, because a site that resolves complaints records them and a site that only discounts them does not. If you cannot visit in person, our factory audit checklist converts the same eight steps into a remote video walk with a timed agenda.

Hydrostatic Head and Spray Rigs Inside the Facility Lab

Three rigs cover most of what a waterproof bag needs to demonstrate, and a plant that owns them can answer a technical question in hours instead of weeks. The hydrostatic head rig clamps a fabric specimen over a rising column of water and records the height in millimetres at which the third drop appears, following ISO 811. It is the correct test for flat goods and it is where the 10,000 mm to 20,000 mm figures on a spec sheet come from, with the low end appropriate to a light pack shell and the upper end to a loaded bag that will be sat on, kneeled on or pressed against a wet deck. AATCC 127 is the equivalent method used when a buyer's laboratory prefers it, and JIS L 1092 appears on many Japanese and Korean specifications.

The second rig is a spray tester to AATCC 22, which holds a taut specimen at 45 degrees under a fixed head and sprays it for a set time before grading the wetting pattern from 0 to 100. It measures the finish, not the barrier, and it is the right test for the outer face of a pack whose shell is treated with a durable water repellent. The third is a rain room built to AATCC 35, which showers a loaded, hung bag from above and is the only one of the three that tests a finished product rather than a swatch. Read the three together and they answer three different questions: how much pressure the fabric holds, how well the face sheds water, and whether the built bag keeps the contents dry. None of the three substitutes for the others, and a supplier quote that cites only one is incomplete.

Immersion behaviour is a separate matter and is normally expressed with an IEC 60529 IP code, which is written against an enclosure and requires a defined depth, a defined duration and a stated function check afterwards. Our hydrostatic pressure explainer sets out the pressure method in detail, and our water ingress test methods page covers what to do with a whole bag rather than a swatch.

Nine Claims a Factory Website Makes That Collapse on Site

Every supplier site in this category makes broadly the same nine claims. Most of them are harmless; four of them are worth testing because they are the ones that correlate with a first order going wrong. The table gives the claim, what it usually means in practice, and the one question that resolves it. Use it during a video call rather than in email, because the pause before the answer is more informative than the answer.

Website ClaimWhat It Usually MeansThe Question That Resolves It
We are a manufacturerThey hold a business licence with trading scopeWhich of the five steps do you perform in this building?
Factory direct pricingSomebody in the chain is being paid a marginCan you show the fabric invoice for the last roll you bought?
20 years experienceThe owner has 20 years; the entity may be newerWhat year was this legal entity registered?
Full certificationCertificates held by a related companyDoes the certificate address match the site I will visit?
10,000 sqm facilityA number typed into a templateWhat are the dimensions of the building you are standing in?
Any MOQ acceptedThey will subcontract and add marginWhich line will run a 500-piece order and in which week?
100 percent waterproofNo test method or acceptance criterion is statedAt what depth, for how long, and to which standard?
Fast samplingSamples are bought from elsewhereCan you show the cutting ticket for my sample?
We export worldwideTheir freight forwarder doesWho is named as shipper on the last three bills of lading?

The eighth claim is the one we would push hardest on. The word waterproof without a depth, a duration and a method attached is not a specification, it is an adjective, and it is the origin of most of the disputes that end with a rejected container. A defensible line reads: holds 1 metre for 30 minutes with no ingress, tested to IEC 60529 with a function check on the contents afterwards. Once you write it that way, the closure hardware, the seam method and the fabric choice all fall out of the sentence, and a supplier who will not commit to the sentence is telling you they will not be held to it.

MOQ 500 per Model per Colour: Scheduling Your First Run

Minimum order quantity at this site is 500 pieces per model and per colour, and that number is a production fact rather than a sales policy. A colour change on a welding line means a new fabric lot, a new printed panel lot, a new webbing dye lot and a machine shutdown to purge and reset the welding parameters for the new film thickness. The changeover costs more than the marginal pieces saved by running shorter, which is why 500 is the figure at which the line economics close. Below that, a broker will happily take your order and place it into a slot on somebody else's line at a price that reflects two margins.

For a first programme the practical consequence is that colours are more expensive than you expect and should be planned deliberately. A 500-piece run in three colours is three production lots, not one, and it consumes three times the setup. The alternative that most new brands miss is to keep one base fabric and one shell colour across the range and differentiate the product with printed panels, webbing colour, hardware finish and trim. That keeps the weld parameters and the fabric lot identical across the whole order, which is also what protects you on a reorder six months later, because the same roll number can be bought again. Our page on custom programme structure sets out how a shared-shell range is specified.

Sampling in 6-10 Working Days: The Week-by-Week Calendar

A first prototype takes 6 to 10 working days for a conventional construction and 12 to 15 working days where the build is complex, meaning a new moulded component, a moulded EVA panel, a welded window, a multi-layer insulation build-up or a closure that has not been run before. The range is not padding; it comes from where the work has to queue. The calendar below is the one we work to, and it is worth holding a supplier to it because a sample that arrives in three days was almost certainly assembled from stock parts rather than built to your specification.

  1. Days 1-2: technical pack review, fabric and hardware confirmation, pattern and tooling release; a moulded part is quoted here and adds 4 to 6 working days on its own.
  2. Days 2-3: pattern making and nesting, then cutting of the first sample panels from the production-intent fabric lot.
  3. Days 3-5: printing or decoration, which is where sample delay usually originates, followed by drying and cure time that cannot be compressed.
  4. Days 5-7: structural joining, welding or stitch-and-tape, plus hardware fitting and any insulated or padded build-up.
  5. Days 7-8: in-house checks including a hydrostatic head pull on the chosen fabric, a seam peel check and a 30-minute fill or spray check on the finished sample.
  6. Days 8-10: measurement against the technical pack, photography, packing and dispatch with a courier tracking number.

Two things in that sequence are commonly compressed and should not be. Print cure time determines whether the decoration survives abrasion and whether it blocks, and skipping it produces a beautiful sample that scuffs in the carton. The in-house check on day 7 is the second; a sample sent before it has been filled with water and left for half an hour has not been tested at all. Because we run the seventh line as a prototype and pilot cell, a sampling job does not have to wait for a production slot, which is why the calendar holds even in a busy month.

AQL 2.5 Inspection Inside the Plant Before Container Loading

AQL 2.5 under ISO 2859-1 is the acceptance standard applied to finished cartons before they are released for loading, and it is the number that governs whether the container ships. It is a statistical sampling rule, not a promise about an individual bag: at 2.5 it permits a defined number of minor defects in a defined sample size and a much smaller number of major ones. Understanding the classification matters more than the number, because most disputes come from a defect that the supplier classified as minor and the buyer considers major. Write your own classification into the inspection worksheet before production starts, and the argument disappears.

Defect ClassExample on a Waterproof BagTypical Disposition at AQL 2.5
CriticalWeld open along more than 10 mm; roll-top closure separatingAutomatic reject of the lot
MajorTape lifted at a crossing; zip slider binding; strap stitch pull-outCounts against the 2.5 major allowance; lot held at the limit
MinorPrint misregistration under 1 mm; loose thread under 5 mm; light scuffCounts against the minor allowance; normally acceptable
CosmeticFold mark from packing; dust on the film surfaceRecorded but generally not counted

The critical class is where a waterproof bag differs from an ordinary one. On a conventional bag a bad seam is a durability defect that shows up after months of use; on a welded bag it is a functional failure the first time the product meets water. We therefore treat an open weld of any functional length as critical regardless of where it appears, and we pull a destructive peel sample from every production shift rather than relying on the visual inspection alone. The AQL 2.5 draw is then performed on cartons selected at random across the whole lot, not from the first pallets, because the end of a run is where parameter drift shows up.

FOB Xiamen: Cartons, Pallets and Container Stuffing

The standard trade term is FOB Xiamen with T/T, 30 percent deposit and 70 percent before shipment, and the practical meaning for a buyer is that the cost and risk transfer at the point the goods are loaded on board at Xiamen. What sits inside that term is a packing specification, and packing is where a waterproof bag programme quietly loses money. A 40-foot high-cube container holds roughly 60 to 68 cubic metres but very few bags fit by volume alone; they fit by how well the carton cuboid matches the pallet footprint and how much the product can be compressed without creasing the film permanently.

Product TypeCarton Size (cm)Pieces per CartonCartons per Pallet40 HC Load (pcs)
Roll-top dry bag 10 L52 x 38 x 34401812,960
Waterproof backpack 25 L58 x 42 x 3624167,680
Duffel 50 L62 x 44 x 4016145,600
Insulated cooler 20 L54 x 40 x 3820168,000
Phone pouch46 x 32 x 301002438,400

Two of those columns repay attention. Pieces per carton is set by compression: a dry bag can be rolled and nested and so packs at roughly twice the density of a structured backpack, which is why the same 40-foot container absorbs four times as many of them. Cartons per pallet is set by the carton footprint against a 120 by 100 centimetre pallet, and a carton that overhangs by even a few centimetres loses its stacking strength in transit. We also define the pallet height so that a 40 HC is filled to its usable internal height rather than to the nominal one, since the door ring and the floor thickness take more than most calculators allow.

Cost Drivers a China Plant Quotes You Line by Line

A waterproof bag quotation has six lines that move and several that do not. Knowing which is which lets you spend your negotiation on the two that matter. Fabric is usually 35 to 45 percent of the unit cost and is driven by the film type, the base cloth denier and the coating or lamination weight, not by the brand on the roll. Hardware is 10 to 20 percent and is driven almost entirely by whether the closure is a bought-in standard part or a tooled one. Labour is 15 to 25 percent and depends on the number of operations, which is a design variable, not a wage variable.

Cost LineShare of Unit CostWhat Moves ItNegotiation Lever
Shell fabric and film35-45 percentFilm type, denier, coating weight, lot sizeFix the specification, then buy a full roll lot
Hardware and closures10-20 percentStandard versus tooled, finish, platingUse a standard part from the existing tool range
Labour and operations15-25 percentOperation count, automation of weldingReduce operations by designing for fewer panels
Printing and decoration4-10 percentColour count, print method, cure timeReduce to two colours in one print pass
Seam tape and adhesive3-7 percentTape width, metres used per bagKeep the seam lay-up flat to shorten the tape run
Testing, packing, overhead6-12 percentCarton spec, test regime, pallet patternStandardise the carton across the range

The lever column is where a first-time buyer usually looks in the wrong place. Asking for a lower unit price moves nothing; asking for a standard part instead of a tooled one, and for a two-colour print instead of a four-colour one, moves two lines at once and often removes a tooling charge as well. Designing a panel layout that saves one welding operation does the same, because it removes labour without changing the product the customer sees. None of these changes requires a smaller factory or worse materials, which is why they survive into the second and third order.

Owner History and Staff Stability at a Waterproof Bag Site

The last verification is the least technical and the most predictive. The owner of this programme entered the bag trade in 2004 and the production entity was established in 2014, and that decade of distance is typical of the category: people learn the trade on someone else's line and only later build their own. Ask a supplier the two dates separately. A business that quotes only one of them, or that presents a founding year far older than the entity that will actually invoice you, is presenting history it did not build.

Staff stability is the second signal, and it is measurable. Of the 137 people at this site, the welding cell operators are the ones whose tenure matters most, because RF and hot-air welding are parameter crafts: an operator learns the sound and the dwell of a particular film and can tell an under-weld before the peel test confirms it. When you visit, ask how long the cell leader has been on that machine and whether the operators rotate between lines. A plant that rotates weekly is optimising for flexibility and will show more parameter variance; a plant that keeps the same operator on the same film for a year will produce a tighter distribution of peel values and fewer complaints on the second order.

Both signals point at the same thing, which is whether the second order will match the first. Documents, rigs and floor plans tell you what a plant can do once. Owner history and staff tenure tell you what it will do twelve months later, when your reorder is scheduled against a line that is busy and a fabric lot that has to be bought again. If you want to press on any of the thirteen checks on this page, write to service@junyuanbags.com or message WhatsApp +86 177 5002 0688 and we will send the document pack for the specific construction you are quoting.

Frequently Asked Questions

Q1: How do I verify a China waterproof bag factory without visiting?

A: Ask for the document pack first, then request a timed video walk. The sequence that works is a live camera at the gate, the cutting tables, the welding cells, the lab with its hydrostatic head rig, and finally the corrective-action file. A genuine site can move between those five in one call because they are in one building; a broker will need to schedule it.

Q2: What does MOQ 500 per model per colour actually mean?

A: It means each colourway of each model is treated as a separate production lot. A 500-piece order in three colours is three lots, each carrying its own fabric, print, webbing and machine setup. The result is that a multi-colour first run costs and consumes more production time than the piece count suggests.

Q3: Why is sampling 6 to 10 working days and not faster?

A: Because printing needs cure time and structural joining cannot begin before the panels exist. A conventional build takes 6 to 10 working days; a complex one with a moulded part, a welded window or a new closure takes 12 to 15. A sample delivered in three days was almost certainly assembled from stock parts.

Q4: Which is better for my product, welding or stitch-and-tape?

A: It depends on geometry. Welding suits flat and two-dimensional products such as dry bags, pouches and document cases, and gives a seam as strong as the film when parameters are right. Stitch-and-tape suits three-dimensional products such as backpacks and tool bags, because a boxed corner cannot be laid flat under an electrode.

Q5: What should the hydrostatic head be on my bag specification?

A: For a light pack shell, 10,000 mm is the practical floor; for a loaded bag that will be sat on, kneeled on or pressed against a wet deck, specify 20,000 mm or above. The figure is measured on flat goods to ISO 811 or AATCC 127 before any seam exists, so it describes the fabric and not the finished product.

Q6: What does AQL 2.5 cover and what does it miss?

A: AQL 2.5 under ISO 2859-1 is a statistical sampling rule applied to finished cartons, and it permits a defined number of minor and major defects in a defined sample size. It is not a promise about any individual bag, which is why you should write your own critical, major and minor classification into the worksheet before production begins.

Q7: How many containers will my 500-piece first order fill?

A: Rarely one. A 40-foot high-cube container absorbs roughly 12,960 ten-litre dry bags but only about 5,600 fifty-litre duffels. A 500-piece first run is normally shipped as a consolidated or less-than-container load, and the container question only becomes relevant from the second or third order.

Q8: What documents must I receive before paying the 30 percent deposit?

A: Eight, of which two matter most: the fabric lot certificate and the seam test log. Those two confirm the roll can be bought again and that somebody in the building measures a weld. The other six confirm existence but say nothing about repeatability.

Q9: Can a factory really hold ISO 9001:2015 and BSCI at the same time?

A: Yes, and the two cover different things. ISO 9001:2015 covers the documented quality management system and carries a scope wording that must name bags. BSCI is a social compliance audit covering working conditions and carries a factory name, an audit date and a headcount.

Q10: How do I know a capacity figure is real?

A: Cross-check it. Divide the quoted monthly output by the working days, then by the line count, then by the operators per shift, and compare that implied shift output with what the cell leader says they made yesterday. Inflated capacity figures collapse under that arithmetic.

Q11: What is the difference between FOB Xiamen and a delivered term?

A: FOB Xiamen means cost and risk transfer when the goods are loaded on board at Xiamen, and everything after that is yours. A delivered term such as DDP bundles freight, duty and last-mile into the unit price and removes your visibility of those components.

Q12: Do I pay the balance before or after inspection?

A: Seventy percent is paid before shipment under T/T 30/70 terms, so the AQL 2.5 inspection has to happen before the balance is released. Insist that the inspection report with its defect classification and accept or reject decision is in your hands before you authorise the payment.

Q13: What is the fastest way to tell an intermediary from a plant?

A: Ask which of the five production steps happen in the building they are standing in, and then ask to see the cutting ticket for your sample. An intermediary has to ask somebody else for both, and the delay is your answer.

Q14: How does the plant make sure my reorder matches the first order?

A: By holding the fabric lot number, the welding parameter set and the print mesh record against your model reference, and by buying the same roll for the reorder. A printed panel without a mesh record and a fabric without a lot number cannot be reproduced exactly twelve months later.

People Also Ask

  • How can I check if a China bag factory is real?
  • What is the usual MOQ for waterproof bags in China?
  • How long does waterproof bag sampling take?
  • What certificates should a waterproof bag factory hold?
  • Is FOB Xiamen better than DDP for a first order?
  • How do I audit a bag factory by video call?

Turn this into a spec you can quote

Send us your target rating, capacity and volume. Sampling takes 6–10 working days, bulk runs 35–50 days, and every shipment is inspected to AQL 2.5 (ISO 2859-1) at MOQ 500 pcs per style and colourway.

Request a quote See OEM process